A wedding feeding 300 people can't run on charcoal in the rain. Event gas supply is logistics — here's how caterers do it right.
Sizing for Events
- 13kg cylinders — the caterer's workhorse. Most field stoves run on them; portable, exchangeable.
- How many? Rule of thumb: 1 × 13kg per 100–150 meals cooked. For 300 guests: 2–3 cylinders — and always one spare.
- 50kg — for static large events (cooking on-site all day) — fewer swaps, more stability.
Event-Day Planning
- Order ahead — book delivery to the venue the day before, not the morning of.
- Stage the cylinders — upright, ventilated, away from guest traffic and ignition sources.
- Test before service — light every burner an hour before you need it.
- Spare cylinder + spare regulator — events die on single points of failure.
- Designate a gas manager — one person owns valves, swaps and leak checks.
Transport Rules
- Cylinders upright and secured in the vehicle — never rolling loose.
- Valves closed and capped during transport.
- Ventilate the vehicle — windows cracked.
- No smoking near the cylinders — ever.
Field Kitchen Safety
- Cooking area cordoned from guests — especially children.
- Hoses routed where feet can't trip them.
- Fire extinguisher or sand bucket at the cooking line.
- Same leak rules apply — smell gas = close valve, ventilate, follow the steps.
After the Event
- Close all valves before loading out.
- Return empties for exchange — don't leave them at the venue.
- Inspect hoses before the next job — field work is hard on equipment.
Frequently Asked Questions
Can you deliver cylinders to a venue?
Yes — PataGas delivers to event venues across Nairobi; book at least a day ahead for timing.
What's the most common event gas failure?
A single cylinder emptying mid-service with no spare — always over-provision by one.
Do caterers need special equipment?
High-output field burners need a high-pressure regulator — different from home gear. Tell us your setup when ordering.
Cooking for a crowd? Book event delivery — cylinders staged at your venue on time. Plan supply →